Analysis Of Blockchain Technology Usage For Business Process Management
Table 3: Hypothesis Three Computation of PPMC Coefficient (r) using The Deviation Method
A | 40 | 35 | 4.6 | 2.2 | 21.16 | 4.84 | 10.12 |
B | 76 | 68 | 40.6 | 35.2 | 1648.36 | 1239.04 | 1429.12 |
C | 39 | 48 | 3.6 | 15.2 | 12.96 | 231.04 | 54.72 |
D | 20 | 12 | -15.4 | -20.8 | 237.16 | 432.64 | 320.32 |
E | 2 | 1 | -33.4 | -31.8 | 1115.56 | 1011.24 | 1062.12 |
5 | 177 | Y= 164 | =2708.8 | = 2876.4 |