Analysis Of Blockchain Technology Usage For Business Process Management
Table 1: Hypothesis One Computation of PPMC Coefficient (r) using The Deviation Method
A | 30 | 45 | -0.6 | 14.2 | 0.36 | 201.64 | -8.52 |
B | 64 | 56 | 33.4 | 25.2 | 115.56 | 635.04 | 841.68 |
C | 39 | 33 | 8.4 | 2.2 | 70.56 | 4.84 | 18.48 |
D | 16 | 14 | -14.6 | -16.8 | 213.16 | 282.24 | 245.28 |
E | 4 | 6 | -26.6 | -24.8 | 707.56 | 615.04 | 659.68 |
5 | 153 | Y= 154 | =1738.8 | = 1756.6 |