Performance indicators |
Before improvement (P1) |
Objectives (P2) |
Results (P3) |
Weight coefficient |
Goal achievement rate (K) |
Safety (number of tanks operated with industrial safety violations, pcs.) |
36 |
0 |
0 |
0.19 |
1.00 |
Quality (percentage of rejects due to poor-quality flushing of the wellbore, %) |
9 |
5 |
6 |
0.22 |
0.80 |
Terms (average repair time, hours) |
156 |
152 |
152 |
0.21 |
1.00 |
Costs (transportation costs for 1 crossing, thousand rubles) |
33 |
11 |
12 |
0.20 |
0.90 |
Culture (number of violations of production culture for 1 repair, pcs.) |
7 |
4 |
5 |
0.18 |
0.75 |
Performance rate, % |
0.89 |