Estimated indicators |
Indicator |
Performance scores |
Maximum points per indicator |
1. Percentage of elimination of unauthorized landfills |
Elimination of one unauthorized dump in the municipal district out of 18 |
2.75 % or 1 point |
9 |
2. Percentage of elimination of authorized landfills |
Elimination of rats |
25 % or 4 points |
16 |
Extinguishing fire |
50 % or 8 points |
Technical stage of reclamation |
75 % or 12 points |
Technical and biological stages of reclamation |
100 % or 16 points |
3. Coefficient equal to the ratio of the number of containers used to their number corresponding to the volume of waste generated |
Installation of 8 containers of 161 pcs. |
0.05 or 1 point |
20 |
4. The level of development and implementation of the MSW management scheme |
Availability of a spatial layout of container sites |
6 points |
24 |
Availability of the required number of vehicles |
6 points |
Availability of a logistic scheme for transporting waste to the place of their burial, sorting or processing |
6 points |
Availability of a schedule for the removal of MSW |
6 points |
5. Coefficient showing the ratio of the number of container sites equipped with containers for separate collection of individual waste components to the total number of required container sites |
Organization of 9 container sites of 46 pcs. |
0.2 or 1 point |
5 |
6. The level of development and implementation of a scheme for collecting secondary material resources |
Availability and working hours of mobile waste collection points |
2 points |
8 |
Availability of receiving and procurement complexes |
2 points |
Availability of a logistic scheme for transportation of compacted waste to the place of their processing |
2 points |
Availability of facilities for processing recyclable components |
2 points |
7. Implementation of a waste sorting station |
Waste sorting station |
18 points |
18 |
TOTAL |
|
|
100 |