Introduction Of Digital Technologies In Quality Control Processes Of Low-Rise Construction

Table 4:

Title Distance from the center Cost of land, rubles per hundred Construction costs, RUR per sqm Current stage of construction
1 Volga's Harbour 12 700 000 –1 150 000 from 42 000 construction is underway
2 Primavera 12 500 000** from 52 700 construction completed
3 Kovalinsky 22 350 000 –500,000 from 37 000 construction is underway
4 Bright Park 35 300,000 from 50 000 at the design stage
5 Kazan manor 15 300,000 from 15 000*** construction completed
6 Blue lake 18 280,000 from 32 000 construction is underway
7 Light 20 205 000 –250,000 from 28 000 *** construction is underway
8 Turgay 35 110 000 –180,000 from 28 000 construction is underway
9 Ecopolis «Two forests» 12 - - at the design stage
10 The Project Unistroy 18 no data no data at the design stage