Development Of A Constraint Management Methodology For An Oil Field Development Project
Table 2:
Interval, % | Point | Rating | Description |
0-30 | 1 | low | The possibility of a restriction is extremely low |
31-70 | 2 | average | The design constraint will occur with a sufficient degree of probability |
71-100 | 3 | high | Design constraint will be implemented |