European Proceedings Logo

Development Of Program Measures For Import Substitution In Gas Production

Table 4:

Indicators Value
The design capacity of the LNG plant, million tons/year 10-12
The annual sales volume of LNG, million cub metres 11/15620
The proceeds from the sale of LNG (11*106*1000*22 rub/kg), million rub 242000
Capital investments, million rub 45788.9
Operating costs total million rub, including: 41806.6
- purchase of gas 26879
- materials 8192
- gas for own needs 600.2
- electricity 115
- wage fund with insurance payments 3120
- overhead 650
- depreciation 1560
- maintenance and repair of equipment 624
- other costs 156
Gross profit, billion rub 200.2
Profit tax, billion rub 40.1
Net profit, billion rub 159.1
Cash flow cash flow (PVt), billion rub 161.4
Net present value (NPVt), billion rub 143.7
Accumulated discounted income (NPV), billion rub 1106.2
Internal rate of return (IRR), % 2515
Payback period of capital investments (PEB), years 0.3
Simple rate of return (SRR), rub/rub 3.5
Profitability of production (R), % 437
< Back to article