Rationale For Economic Expediency Of Complex Utilization Of Ash And Slag Waste
Table 3:
Item number | Name | Price, roubles | Unit ofmeasurement |
1 | Digging of excavation pit | 150 | m3 |
2 | Removal of soil by dump trucks | 22 | km |
3 | Layout of areas, tops and slopes of the pit | 280 | m2 |
4 | Purchase of Geomembranes | 275 | m2 |
5 | Installation of Geomembranes | 45 | m2 |
6 | Laying of sewage pipes | 250 | linear metre |