Estimates of the level of organization |
Number of tour operators, n |
11 |
12 |
13 |
Po (the likelihood that all tour operators are free) |
7.47*10-5 |
8.75*10-5 |
6,63*10-5 |
N3(the average number of busy tour operators) |
9 |
9 |
9 |
No (the average number of tour operators with no requests) |
2 |
2.76(~3) |
3,76(~4) |
K3 (the load factor of a tour operator) |
0,84 |
0,77 |
0,71 |
Kdt (the downtime factor of a tour operator) |
0,16 |
0,23 |
0,29 |
M0 (the average number of tourists groups waiting for start of group forming) |
2,52 |
1,01 |
0,32 |
Twait (the average waiting time of a tour formation) |
6,57 h |
2,62 h |
49 min |
Ps>=n (the likelihood that all tour operators are engaged in the formation of tours) |
0,48 |
0,303 |
0,13 |
Mт (the average number of groups in the entire system) |
11,75 |
10,24 |
9,55 |
CdtN0 (thous.rub.) |
4777,6 |
8100 |
10800 |
Cen (thous.rub.) |
33660 |
36720 |
39780 |
CwaitM0 (thous.rub.) |
11037,6 |
4423,8 |
1401,6 |
The amount of costs (thous.rub.) |
49475,2 |
49243,8 |
51981,6 |