Description Number, pcs General time, s Average time per 1 pc % from general time
Takes the body 10 48 4,8 2,77
Unpacks the body 10 61 6,1 3,50
Throw out the paper 10 4 0,4 0,23
Visual monitoring 10 32 3,2 1,88
Takes a socket spanner 5 1 0,3 0,08
Installation of a sealing bolt 10 110 11,0 6,34
Puts a socket spanner 5 1 0,3 0,08
Checking of a socket spanner 1 7 6,7 0,39
Wire installation 10 121 12,1 6,99
Fixing of a wire by means of a sealing bolt 10 157 15,7 9,06
Installation LP 10 137 13,7 7,91
Takes a fastener driving machine 10 4 0,4 0,21
Mounting LP 40 169 4,2 9,76
Puts a fastener driving machine 10 4 0,4 0,23
Mounting of a bracket 100 673 6,7 38,93
Examines the wire socket 3 55 18,2 3,15
Sends to correct a spoilage 3 15 4,9 0,85
Completion of a bracket mounting 2 99 49,6 5,74
Delivery to the next stage 10 33 3,3 1,89